Residential Home for the Elderly of Anta

Construction of a residential structure for the elderly with a capacity for 80 permanent users and a day center for 20 users.
Largo de São Julião Rehabilitation

Rehabilitation, maintaining the constructive characteristics and origin, of this Pombalino Building built right after the earthquake of 1755. It is intended, within the framework of this project, that the building will be used for the installation and operation of services by the Lisbon City Council.
Pulido Valente Hospital

Remodeling of part of the building to install a Continuing Care Unit. The work was carried out over 5 existing floors and includes an intervention on the roof to install an elevator.
USF of Buraca

Construction of a Family Health Unit.
Campus Clinic

Construction of a private clinic building.
USF of Alto dos Moinhos

Construction of a health unit, with a unique image in the urban context in which it operates, assuming itself as a reference in the neighborhood.
UCCI of Ferreira do Alentejo

The building was partially built. The intervention aimed to improve the efficiency of use, in order to increase the usefulness of this equipment for the region.
IPO Lisboa

Remodeling and expansion of IPOLFG’s Central Operating Room, including execution of all specialties and supply of hospital equipment.
USF of Alcântara

The work on the Alcântara Health Unit is completed. This renovated building will have offices for medical and nursing consultations, treatment rooms, an examination room, an oral health room, psychologist and social services, speech therapy and nutrition. In this project, an attempt was made to reuse the existing building as much as possible, adapting it […]
USF of Fonte Nova

The design is based on the following guiding principles: integration, identity and functionality. These assumptions lead us to a building that values proximity and interconnection with outdoor spaces and, in this way, also with the target community.